RESTORATION PICTURES
First, the furniture was moved and the walls and ceilings were stripped.
Next, the back and front steps were removed and the inside framing was done.
Next, the back entry was completed and a front walkway was installed. Inside the new heating system was installed.
Now we have steps leading to the back entrance, and outside, new siding.